Engineering Reliable Infrastructure for Eastern DRC

Learn how INFRA VISION MODERNE (IVM-SARL) combines regional expertise, modern hydraulic standards, and rigorous site execution to build sustainable civil infrastructure.

Company Overview

Rooted in Goma, Serving Communities Across the DRC

INFRA VISION MODERNE (IVM-SARL) was established to address the critical need for durable, professionally engineered water supply and civil infrastructure in the Democratic Republic of the Congo.

With our registered headquarters situated at 104 Kituku Avenue, Kyeshero Quarter in Goma, and active operational branch desks in Beni and Bunia, IVM-SARL operates across key provinces including North Kivu, South Kivu, and Ituri.

Our core mission revolves around solving complex infrastructure challenges: navigating volcanic topography, ensuring water pressure consistency across vast distances, constructing robust reinforced concrete storage facilities, and executing critical emergency and development water networks for international aid agencies, government utilities, and private developers.

Headquarters: Goma
Branch Operations: Beni & Bunia
IVM-SARL civil engineering team in discussion overlooking infrastructure project
Engineering Leadership On-site supervision & quality control across DRC
Core Philosophy

Our Mission, Vision & Guiding Values

Our foundation is built upon technical discipline, community accountability, and unwavering ethical standards.

Our Mission

To design, construct, and rehabilitate civil engineering and water infrastructure systems that provide clean water, strengthen community resilience, and support long-term socio-economic development across the Democratic Republic of the Congo.

Our Vision

To be recognized as the premier indigenous engineering and water contractor in Central and Eastern Africa, chosen for uncompromising quality, safety excellence, and dependable delivery in complex operating environments.

Our Core Values

Integrity: Honest contracts, transparent procurement.
Technical Rigor: Adherence to international hydraulic standards.
Community Respect: Empowering local workforces.
Safety & Care: Zero harm to workers and the environment.

Topographic surveying and pipeline grading in the field
Integrated Project Delivery From initial topographic survey to final hydrostatic testing
How We Work

Structured Project Management Approach

Every project undertaken by IVM-SARL progresses through a structured quality gate process, minimizing risk and ensuring client satisfaction.

1. Topographical Survey & Hydraulic Modeling

Precise optical leveling, elevation mapping, soil stability tests, and flow calculations before trenching or excavation begins.

2. Certified Materials Procurement & Logistics

Rigorous verification of pipe pressure ratings (PE100 PN10/PN16), certified cement, clean graded aggregates, and tamper-proof valve hardware.

3. On-Site Supervision & Execution

Daily oversight by qualified civil and hydraulic engineers, enforcing trench safety, formwork reinforcement, and concrete vibration standards.

4. Testing, Commissioning & Handover

Hydrostatic pressure testing, water quality analysis, joint inspections, and training of local community water management committees.

Community Engagement

Empowering Local Technicians & Building Community Ownership

Sustainable infrastructure cannot exist without local community participation and technical capacity building.

Wherever IVM-SARL operates—whether in urban Goma or rural South Kivu settlements such as Lusenda, Mboko, and Nundu—we engage closely with customary leaders, village elders, and local water management committees (Comités de Gestion de l'Eau).

We prioritize hiring local masons, pipefitters, and laborers, providing on-the-job training in pipe joining, valve maintenance, and concrete curing. This approach generates local income, fosters security, and ensures the community has the skills to operate and maintain water points long after construction concludes.

Local Employment

Over 80% of on-site labor sourced directly from beneficiary communities.

Social Acceptance

Transparent consultations preventing resource disputes and ensuring equitable water access.

Local engineering personnel wearing safety equipment on site
Community Partnership Capacity building and respectful community collaboration

Discuss Your Next Project With Our Team

Whether you are an international NGO, government body, or private partner, IVM-SARL is ready to mobilize.